Rectification Work of Low Voltage Switchboards (2023) in Retail Tower, Langham Place Mong Kok, Kowloon By darren2023 年 2 月 1 日
Periodic Inspection, Testing and Certification of Electrical Installations (Tx. 2, Tx.3, Tx. 4 and Tx. 5) at Great Eagle Centre By darren2022 年 1 月 16 日
Electrical Installation for Retrofitting of Fluorescent Luminaire to Light-Emitting Diode (LED) Luminaire Fitted Motion Sensor By darren2022 年 1 月 15 日
Rectification Work of Low Voltage Switchboards (2022) in Retail Tower, Langham Place Mong Kok, Kowloon By darren2022 年 1 月 13 日
Supply and Installation of Exit Sign for L4 Podium Garden, Retail Tower, Langham Place Mong Kok, Kowloon By darren2022 年 1 月 11 日
Reprogramming Works of New Specialized Transformers’ IP Address for LED Lightings of Fashion Staircase on L6, Retail Tower, Langham Place Mong Kok, Kowloon By darren2022 年 1 月 10 日
Langham Place, Retail Tower – Supply and Replacement of the Existing Defective Contractors for 63A 4 Pole Automatic Changeover at B1 Switch Room By aeme2021 年 4 月 19 日
Langham Place, Retail Tower-Reprogramming Works of New Specialized Transformers’ IP Address for LED Lightings of Fashion Staircase on L6 By aeme2021 年 1 月 4 日
Langham Place, Retail Tower – Inspection, Testing and Reinstatement of 2500A Busbar Feeder for Busbar No. B/T/02 at L7 Meter Room A By aeme2020 年 10 月 23 日
Langham Place, Retail Tower- Electrical Installation Work for Additional Signaling Control from Existing Shutter to Escalators (no. E5 and E6) on L1 By aeme2020 年 10 月 22 日